Mechanical installation silica gel
Installation method with the mechanical type silica gel, the different types of machines vary, but the installation of almost all essentials the same installation steps and precautions are as follows:
(1) determine the size of installation
Installation, should be the product manual or the sample to ensure that the installation of mechanical silica gel size.
(2) pre-loaded shaft (sleeve), gland should be no burr, bearing in good condition; silica gel parts, shafts, silica gel cavity, gland should be cleaned. To reduce friction, the shaft to install machinery to the site of silica gel coated with a thin layer of oil for lubrication, taking into account the rubber O-ring compatibility, if not oil, can be coated soapy water. Float-mounted anti-static ring resale without the structure, not oiled, should be dry mounted gland.
(3) with the first stationary ring and disc mounted on the shaft, careful not to collide with the axis, and then ring components into. Block Spring Block or drive several times set screws should be tightened evenly.
Fixed gland without prior compensation he pushed the ring for axial compression, release the ring after the compensation automatically bounced back cable wiring, and then evenly tighten gland bolts.